ARH Jurukur Bahan Sdn Bhd
have completed numerous projects over the years since it’s founding in
1988 and covered several sectors of the construction industry :
PROPOSED RASAU WATER SUPPLY SCHEME PACKAGE A – RAW WATER INTAKE & PUMPING STATION AT SG. KLANG (1,600 MLD), RIVER
GATE/BARRAGE, RAW WATER PIPES, PONDS INTERCONNECTION, WETLAND AND WATER QUALITY MONITORING STATION FOR YTL GROUP
CADANGAN MENAIKTARAF SISTEM AGIHAN BEKALAN AIR DI DAERAH KLUANG DAN MERSING MELIPUTI KAWASAN:
SEMBRONG TIMUR, KG GUNUNG LAMBAK, FELDA ULU BELITONG, KG. PAYA, BANDAR BARU IBRAHIM MAJID DI DAERAH KLUANG
KAWASAN AGIHAN LOJI RAWATAN AIR TENGLU & LOJI RAWATAN AIR ENDAU; DAN
KAWASAN AGIHAN LOJI RAWATAN AIR SUNGAI MERSING
JOHOR DARUL TAKZIM UNTUK PENGURUSAN ASET AIR BERHAD